Tiling installation, wall and/or floor
Tiling could be done at the same time with the bathroom and/or kitchen installation or separately. Before tiling installation surface will be levelled and floor will be strengthened with 12-18mm plywood, partition wall in the bathroom will be strengthened where sink or WC will be installed for greater support, and near the bath or shower plasterboard will be replaced by special waterproof sheet material.
All jobs done by highly educated and skilled workers up to your specification and UK standards.